Tuesday, June 30, 2009

Test Fitting New Pipes


Rotor Scuffing


Taking the time to prep. the rotor.

Clean, scuff, clean, scuff, clean.

Correcting the hat

No Brakes


Getting ready for new front rotors.

OOOOppppssss


We found silicone on the brake rotor hat bolts.

Why? Were not sure. This interupts the bolts mechanical grip.


Cryo Treated Slotted Rotors



Prepping for installation.

Big grills

Friday, June 26, 2009

Overdose!!!

Big boost

Wednesday, June 24, 2009

Monday, June 22, 2009

We struck oil

When the transmission failed at the last track event, it left oil EVERYWHERE!!!!!!!!!!!

Friday, June 19, 2009

Thursday, June 18, 2009

Monday, June 15, 2009

Brakes

More pipes

Saturday, June 13, 2009

Cooler

A really big intercooler!!!!!

Friday, June 12, 2009

New Turbo Pipes...what is Robert up to now?

After loosing his transmission.

Robert decided to go for a full ITE build.

He opted to also switch to a single turbo set up after looking at the pros/cons between his first set up.

Thursday, June 11, 2009

Oil change

Extra parts for oil changes.

Temporary windows

Rain

Ok, so we forgot that he had an open trailer and ended up on a rainy day.

Robert only puts his coat down for his Noble, even his wife doesn't get it...J/K....we think!

No windows and Robert saves his noble.

Noble gets on trailer

The Noble works well with the new tire mount.

Ready to head home

Fire system pull handle

Battery cut off

Back

Side

Front

What's the button?

Custom mounted battery cut-off.

Neatly intergrated to the roll bar mounts.

Net

More decals

Decals

SCCA requires decals strategically located for corner workers.

Note: The TurboHoses R&D decal must be on the side of the car.:)

Tow me

Where does this go?

Ants

We were running out of time and all hands went to work on Robert's Noble.

We're suprised that everyone actually fit in the work area of a Noble.

Chris works the interior, Shane cleans and Jim works suspension.

Crunch time

Crunch time is right. It happens often at the shop, but we all work in a calm rage.

Team work is key to run a successful shop, and this team works very well together.

Like brothers, we do fight, but no one has went to the hospital, yet.;)

Open says me

the door bars are very easy to work with.

The swing bars work. Very user friendly.

Door bars

We hope that this passes inspection.

It works

Spring me

A change in spring height.

The springs bottomed out and we could not lower it any more. A quick change in spring height and we were back in business.

Represent

It was important to Robert to run our decals.

We were happy to oblige.

Swing mounts for bars

No window handle?

More fire system install

Fire system install

I can really see

A larger mirror for quick view.

I can see

Trailer done

Wahhhlaaaaaa...

The trailer is complete and awaits the Noble to ride it.

Seat to high

Correct seat position is very important.

It initially felt like sitting in a bus. We pulled the seat out and made adjustments to the bracket. A plan to mount it lower for better driver position is key to fast lap times.